FAQ
Yes! We have professional in-house engineers and experienced consultants to provide customized scaffolding and formwork designs. If you’re unsure about material quantities, we can calculate it for you.
Design drawings are charged, but the fee will be deducted from your order.
Fojian GOWE has over 30 years of industry experience and is a leading manufacturer and supplier of formwork & scaffolding systems, construction equipment, and engineering solutions. We integrate R&D, production, sales, and rental, with 500+ experts, 360+ patents, and 100+ facilities worldwide.
GOWE products are used in various global construction projects including exhibition centers, railways, bridges, subways, and tunnels. Notable cases include the China-Thailand Railway, Beijing Daxing Airport, and Tianjin PingTai Skyscraper.
We meet international quality and safety standards:
- ISO 9001 (Quality Management)
- ISO 14001 (Environmental Management)
- OHSAS 18001 (Occupational Health & Safety)
- EN 1090-2 (Steel Structures)
- EN 12811 (Ringlock Scaffolding Systems)
Yes, we provide tailor-made scaffolding and formwork systems to suit your unique project needs, optimizing both efficiency and cost.
We offer on-site technical guidance depending on project requirements, typically for one month or one standard floor.
Yes, we offer both purchase and rental options based on your budget and project timeline.
Normally 35–52 days depending on design, production, and logistics. Contact us for accurate estimates.
Aluminum Formwork Q&A
For buildings with more than 20 standard floors, the total cost of aluminum formwork is lower.
Aluminum formwork saves around 35% of labor costs compared to timber.
No. Each panel is numbered and corresponds to the drawing, so even unskilled workers can install it after a short training.
If you use the release agent correctly and clean panels after each use, build-up won’t occur.
No. We can pre-cut pressure slots into the formwork according to your drawings.
Stairs can be formed in one go or in sections by opening stair panels to ensure a better finish.
For 40 units: 10 days for design, 35 days for production, 7 days for logistics—about 52 days total (shipping time varies by port).
You get a fair-faced concrete finish with a smooth wall, vertical tolerance of 3–5mm, no plastering required.
No, if properly installed and reinforced. Always follow construction standards and check before pouring.
It’s ideal for houses, villas, high-rises, and other modern buildings. We recommend it for projects over 20 floors.
Yes. For irregular parts, combining aluminum and timber formwork is cost-effective.
Yes. We provide tailored plans to integrate aluminum formwork with prefab elements.