Beijing Pinnacle Project — Beijing Daxing International Airport

Location:
Daxing District, Beijing, China

Contractors:
A national-level infrastructure project
Core construction support systems provided by GOWE Group

Timeline:
Total construction period: 4 years
GOWE participation: 7 months
Officially opened: September 30, 2019

Project Overview:
Recognized as the top of The Guardian’s “Seven Wonders of the New World,” Beijing Daxing International Airport is the world’s largest single terminal building, spanning over 1.4 million square meters—equivalent to 63 Tiananmen Squares. The roof alone covers an area the size of 25 football fields, setting new benchmarks for global aviation architecture.

GOWE Group’s advanced formwork and scaffolding systems played a key role in enabling the rapid and sustainable construction of this iconic project. Utilizing early dismantling formwork systems, over 100 workers completed critical phases of the project in just 7 months. With a turnover rate of 3 times, GOWE’s materials demonstrated exceptional reusability and efficiency.

Main Application Areas:

The main terminal of Daxing Airport

Dual-in and double-out elevated viaducts

Double-deck departure bridges

Underground pipe gallery beneath the high-speed railway

Products Supplied by GOWE:

Aluminum alloy formwork systems

Tunnel and semi-tunnel formwork

Scaffolding support structures

Integrated green building materials and systems

Project Highlights:

Contribution to a world-class aviation hub

High-efficiency, sustainable formwork technology

Recognized by the mainstream infrastructure market

Enhancing GOWE’s leadership in smart construction

 

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top