Application Scenarios
Bracket system anchoring
Aluminum formwork system connections
Wall, slab, and elevator shaft formwork installation
High-rise building and infrastructure construction projects
The tie rod is a construction accessory used as an embedded anchor to securely fix brackets or panels onto concrete surfaces during installation. It plays a critical role in stabilizing formwork systems and structural elements like walls and slabs, ensuring the safety and quality of construction operations.
Bracket system anchoring
Aluminum formwork system connections
Wall, slab, and elevator shaft formwork installation
High-rise building and infrastructure construction projects
High-Strength Anchoring: Provides excellent holding power, firmly securing brackets and panels to the concrete.
Durable and Reliable: Made from premium materials with strong tensile strength and corrosion resistance.
Easy Installation: Embedded installation method allows for quick and efficient setup.
Wide Applicability: Suitable for use in wall, slab, elevator shaft, and other concrete structure construction.
Reusable Options: Certain types of tie rods can be reused multiple times, reducing material costs.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.