Application Scenarios
Support for working platforms and safety screens
Structural reinforcement for smart climbing systems
Temporary support structures in large-scale construction projects
The Diagonal Brace connects the inner and outer vertical posts to form a stable frame structure that supports the dead weight and live load of the platform and the safety screen. The inner side of the diagonal brace is connected to the inner vertical post, while the outer side is linked to the platform frame and the outer vertical post, enhancing the overall structural stability.
Support for working platforms and safety screens
Structural reinforcement for smart climbing systems
Temporary support structures in large-scale construction projects
Enhanced Structural Stability: Forms a solid triangular support structure by connecting vertical posts and platform frames.
Strong Load Capacity: Effectively supports both the dead weight of the platform and the dynamic loads during construction.
Easy Installation: Designed for quick and efficient assembly and disassembly.
Wide Application: Suitable for various climbing systems and transfer platform systems.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.
We believe the projects that we have executed speak for themselves. CITIC HIC has engineered and provided 6 AG mills of Ø12.2m×11m (28000kW gearless drive) and 6 overflow discharge ball mills of Ø7.9×13.6m (2×9000kW gear drive) for Sino Iron Project in Australia. For Zijin Mining’s Duobaoshan Copper Mine project in Heilongjiang, we have manufactured and provided SAG mills of Ø11×6.4m (2×9000kW) and overflow discharge ball mills of Ø7.9×13.6m (2×9000kW) which have been well operating currently.