How to Build a 33-Storey Tower in 135 Days? GOWE Aluminum Formwork Provides the Solution

In high-rise construction, speed equates to efficiency. Traditional wood or steel formwork systems typically require 6–8 days per floor, whereas GOWE’s aluminum formwork system reduces this to 3 days per floor.

⏱️ Project Timeline Comparison

Traditional Formwork Systems: 33 floors × 6–8 days/floor = 198–264 days

GOWE Aluminum Formwork: 33 floors × 3 days/floor = 99 days

Including foundation, tower crane, topping out, and buffer time: Total duration approximately 120–135 days

This results in a 30–50% reduction in overall construction time compared to traditional methods.

🛠️ Advantages of GOWE Aluminum Formwork

Quick-Stripping Design: Formwork can be removed in just 12 hours

High Reusability: Reusable up to 200–300 times, reducing long-term costs

Clean Construction Sites: No wood debris, rust, or nails

Precision Casting: Smooth concrete surfaces, minimizing rework

Modular System: Suitable for walls, columns, beams, slabs, stairs, and more

 

📈 Enhanced Project Benefits

Shortened Construction Time: Save several months on the project timeline

Reduced Labor Dependency: Increase construction efficiency

Improved Build Quality: Minimize rework and ensure structural precision

Lower Unit Costs: Reduce material waste and labor expenses

Support for Green Building: Align with sustainable development goals

GOWE is committed to providing efficient and environmentally friendly formwork solutions for clients worldwide. If you have project requirements, please contact us for a customized proposal and construction timeline assessment.

 

 

 

 

 

 

 

 

 