Company News

Aluminium Formwork Cost Comparison: Which Option Saves More in 2026

How Does Aluminium Formwork Compare to Traditional Systems in Overall Cost? What Are the Initial Cost Differences Between Aluminium and Traditional Formwork? Aluminium formwork systems often need a bigger upfront investment than wood or steel options. This happens because of the price of aluminium alloy materials, careful manufacturing steps, and the planned modular setup that […]

Aluminium Formwork Cost Comparison: Which Option Saves More in 2026 Read More »

How to Build a 33-Storey Tower in 135 Days? GOWE Aluminum Formwork Provides the Solution

In high-rise construction, speed equates to efficiency. Traditional wood or steel formwork systems typically require 6–8 days per floor, whereas GOWE’s aluminum formwork system reduces this to 3 days per floor. ⏱️ Project Timeline Comparison Traditional Formwork Systems: 33 floors × 6–8 days/floor = 198–264 days GOWE Aluminum Formwork: 33 floors × 3 days/floor =

How to Build a 33-Storey Tower in 135 Days? GOWE Aluminum Formwork Provides the Solution Read More »

Aluminum Formwork: Rent or Buy? A Cost-Benefit Guide for Contractors

In modern construction, aluminum formwork systems have become the preferred choice for high-rise and repetitive projects due to their efficiency, precision, and sustainability. 🔍 What is Aluminum Formwork? Aluminum formwork is a modular system made from high-strength aluminum alloy, comprising: Panel System: walls, slabs, beams, stairs Support System: props and beams Tightening System: pins, wedges,

Aluminum Formwork: Rent or Buy? A Cost-Benefit Guide for Contractors Read More »

Scroll to Top